metal3-chart: update to 0.10.0 #88

Open
steven.hardy wants to merge 2 commits from steven.hardy/Factory:metal3_010 into main
Owner
Aligns with https://github.com/suse-edge/charts/pull/191
steven.hardy added 2 commits 2025-03-13 13:17:12 +01:00
metal3-chart: update to 0.10.0
Some checks failed
Build PR in OBS / Build PR in OBS (pull_request_target) Failing after 46m22s
fde2847f2b
Aligns with https://github.com/suse-edge/charts/pull/191
steven.hardy requested review from dprodanov 2025-03-13 13:17:12 +01:00
steven.hardy requested review from nbelouin 2025-03-13 13:17:12 +01:00
steven.hardy force-pushed metal3_010 from fde2847f2b to d14e937081 2025-03-13 15:37:27 +01:00 Compare
Author
Owner

@nbelouin this had a mistake in the spec file, which I've now fixed and https://build.opensuse.org/project/monitor/isv:SUSE:Edge:Factory:Staging:PR-88 appears to be building, but the checks reported still say failed, do I need to do something to get those results refreshed?

@nbelouin this had a mistake in the spec file, which I've now fixed and https://build.opensuse.org/project/monitor/isv:SUSE:Edge:Factory:Staging:PR-88 appears to be building, but the checks reported still say failed, do I need to do something to get those results refreshed?
Some checks failed
Build PR in OBS / Build PR in OBS (pull_request_target) Failing after 14s
This pull request can be merged automatically.
You are not authorized to merge this pull request.

Checkout

From your project repository, check out a new branch and test the changes.
git fetch -u metal3_010:steven.hardy-metal3_010
git checkout steven.hardy-metal3_010
Sign in to join this conversation.
No Reviewers
No Label
1 Participants
Notifications
Due Date
No due date set.
Dependencies

No dependencies set.

Reference: suse-edge/Factory#88
No description provided.