Improve text
This commit is contained in:
parent
d54ef917bb
commit
a46b9f4505
@ -65,14 +65,14 @@ named with a letter (e.g., [Staging:A](https://build.opensuse.org/project/show/o
|
|||||||
[Staging:B](https://build.opensuse.org/project/show/openSUSE:Factory:Staging:A), etc). When a submit
|
[Staging:B](https://build.opensuse.org/project/show/openSUSE:Factory:Staging:A), etc). When a submit
|
||||||
request is done to a package that belongs to any of the rings, the request is automatically put in a
|
request is done to a package that belongs to any of the rings, the request is automatically put in a
|
||||||
backlog for the Staging Manager (person in charge of Staging Projects) to review and to assign it to
|
backlog for the Staging Manager (person in charge of Staging Projects) to review and to assign it to
|
||||||
a specific Staging Project. The Staging Manager selects some of the requests he considers they
|
a specific Staging Project. The Staging Manager selects some of the requests he/she considers they
|
||||||
belong together and assigns the corresponding packages to the same Staging Project. For example, it
|
belong together and assigns the corresponding packages to the same Staging Project. For example, it
|
||||||
might be possible that other packages fail due to a submit request. In that case, those packages are
|
might be possible that other packages fail due to a submit request. In that case, those packages are
|
||||||
added to the same staging project, so they are built against each other. Once the Staging Project
|
added to the same staging project, so they are built against each other. Once the Staging Project
|
||||||
gets built and tested, all the requests can be accepted and the changes merged into the target
|
gets built and tested, all the requests can be accepted and the changes merged into the target
|
||||||
project.
|
project.
|
||||||
|
|
||||||
The Staging Manager can create as many Staging Projects as he considers and can assign different
|
The Staging Manager can create as many Staging Projects as needed and can assign different
|
||||||
selections of requests to each of them. It is still tedious solving the conflicts that appear
|
selections of requests to each of them. It is still tedious solving the conflicts that appear
|
||||||
between different Staging Projects, but being able to test a lot of packages in parallel is much
|
between different Staging Projects, but being able to test a lot of packages in parallel is much
|
||||||
more efficient than doing the same package by package.
|
more efficient than doing the same package by package.
|
||||||
|
Loading…
x
Reference in New Issue
Block a user